Thread regarding BNSF Railway layoffs

Mechanical utilization

Does anyone feel that the push for this utilization statistics are going to push us to PSR and get a lot of guys laid off?

by
| 1031 views | | 1 reply (last )
Post ID: @OP+17MeoWmI

1 reply

PSR is already here and has been. The mechanical utilization thats being done is the same thing as a time study. Its been done before if you all remember (mems).

by
|
Post ID: @4qpi+17MeoWmI

Post a reply

: