AK been rallying all round the past year about needing more workers for fab. VSP and ER is still fine for oldies, but ISP for fab workers will be detrimental for manufacturing
8 replies (most recent on top)
At least everyone at Intel Ireland is jabbed. I heard about mandatory PCR tests every day for workers on the building project during the scamdemic. Then I heard the jabs were pushed hard. Now we are seeing the consequences
Shipped “Unfinished” process - which process mode are we talking about , 1222 ?
The only safe place is low cost geo.
That’s a massive error - surely AK vulnerable ? Time for change ? Feels like a sackable offence to me. Such material errors shouldn’t be allowed to stand
OP my heart goes out to you because I am all but certain of two things:
- that you are right that even a light ISP will cause a catastrophic failure in IFO’s ability to do business
- a deep ISP is coming to IFO
Please! AK/PG/DZ damaged Ireland’s reputation and HVM fabs in general by pushing an unready process as production ready.
Good that Lunar Lake is being fabbed in TSMC. Just imagine what the situation would have been if it was to be manufactured in Intel fabs 😡
Intel was behind in process. Now they are struggling in HVM as well.
*Moving an unfinished process to F34 Ireland too soon is what he said.
TD sent over a sh-t process & they knew F34 wasn't process ready as IQ was barely up on ETS & RTS.
Yet another ELT Business decision that caused failure
The du----s Dave said we lost money moving to Ireland. Laying off or shutting down would be even worse but nothing that these mo--ns we call ELT can't do that won't surprise me