Thread regarding ConocoPhillips layoffs

L48 3 rig program in ConocoPhillips

This is what it takes to support the guys in the field running a three rig program in the L48:

4 x Drilling Managers

4 x Chief Engineers

40 x Drilling Engineers

40 x Completion Engineers

12 x Drilling Techs

8 x Miscellaneous

This is all supported by Global Wells with:

1 x VP

2 x Chiefs

1 x Technology team and manager of a dozen or so

1 x Technical support team of a dozen or so

6 x Miscellaneous

(Assuming a burden if 25% thats an extra 8 people for three onshore rigs)

by
| 2166 views | | 7 replies (last ) | Reply
Post ID: @OP+FO7wldN

7 replies (most recent on top)

It sounds like the potential well in Malaysia in two years time is already planned and simply neds the costs updated - time to cut back to the drilling manager only? How about other BU's?

by
| | Reply
Post ID: @2eqe+FO7wldN

There are least 5 drilling engineers working in the Malaysia BU, planning a well or maybe two that may or may not be drilled until next year. In addition to a Drilling Supt and a Drilling Manager.

On a side note, last in the data released showed the price of oil and gas in the BU's. What was not shown was the revenue and expense in the side packet data! To me the revenue and expense are just as important!

by
| | Reply
Post ID: @2lcy+FO7wldN

Haha.... sounds about right. Just have the pumpers do it they take care of everything else. Close the offices and fire all that don't wear steel toes.

by
| | Reply
Post ID: @nln+FO7wldN

ConocoPhillips CEO says plans to run only 3 rigs in lower 48, doesn't make sense to run more at current prices. http://af.reuters.com/article/commoditiesNews/idAFL2N15J24H

by
| | Reply
Post ID: @aky+FO7wldN

There's no way Conoco is running only 3 rigs in L48.. Don't believe it!

by
| | Reply
Post ID: @wqu+FO7wldN

Glad to see COP has made the transition to a lean, nimble, independent! What a joke.

by
| | Reply
Post ID: @ljw+FO7wldN

The futures strip has April 2017 as the next time we will see $42 oil ... why have all these drillers in the office on the payroll for fifteen months?

It only takes a drilling manager, two drillers, a completion engineer and a workover guy to manage three rigs.

by
| | Reply
Post ID: @qat+FO7wldN

Post a reply

: