Directional drillers were 100% at fault....as usual
people at stoneywood thick as sh--.
Are you now blaming directional drillers ?
run off for incompetence and making big mess of the top hole
Not run off, but a withdrawal of services is what I herd. Thats what they say at Stoneywood anyway.
There's no expertise that's why you got run off in 7 days you moron
One slightly poor fracking performance shouldn't deter BH, when we have the expertise in place at Stoneywood to provide our many clients with further flawless executions and solutions. No worries.
Wha expertise yu were run off in less than a week after massive botch up hahahahahahaha. Dumb f----. Check the records.
Stoneywood middle managers deserve high praise for getting the fracking contract in first place. Unfortunately the decision to 'pull the plug' was taken by senior BH management. Nothing you can do about that. Expertise still at Stoneywood.
GE needs to kick useleesss stoneywood management backsides out on to street. They f----- up big time with this mess. How many millions gone down the toilet.
Tensions go up in stoneywood since when managers lose 500 well project. Hey why do stupid fella.
Wha a load of bull. BH didn't pull the plug they were run off you idiot. Everyone in this industry knows that. Look at the files on the drive network or check the web for fracking projects in Lancashire.
Talk that we were run off is complete poppy c--- and I endorse 100% the brave decision by BH management to pull the plug on the fracking contract at the earliest possible chance.. To try and carryed on would have been financially suicidal for BH.
Typical stoneywood. Everyone calling everyone else an a$$hole. Dregs of the industry and out of their depth you a$$holes
What a bunch of f---ing arseholes do you believe any of this crap. Speak about being reeled in
Clowns
Think everybody is over reacting. Just calm down and support the Stoneywood fracking expertise.
There is no way any frac operator will award a project to stoneywood with this idiot in this office. Kick this w--ker out. Doesn't know the business.
Kick this useless a$$hole out on the street. No wonder we lose money at stoneywood big time.
Hey who's the stoopid stoneywood mgr who doesn't want work. Where you get this moron from?
GE needs to fire this stoneywood idiot
So stoneywood manager say doesn't want work. Wha stupid fxxk. Doesn't know business. Get rid of this a$$hole
You loose 500 wells? Hahahaha better get manager from Mumbai for better job. Get rid of stoneywood manager.
How many wells did stoneywood managers lose? 500 or 600? Hahahahahahaha wow idiot
Replace stoneywood managers with managers from India. They do better job
This frac well was during the Halliburton business. GE weren't in the picture. BH wanted this work becuz it was integrated ops and they spent 2 yrs planning for it. Look it up, there's a summary on the web from the frac operator.
Bet this never happens when fracking with India expertise. Only possible to make such a nonsense with Americun expertise.
Nobody wanted this work, and we did the right thing by GE.
That's becuz stoneywood management botched this contract and lost a heck of a lot of cash. It was integrated operations and the company wanted this work. Wha a balls up.
Bulls---. After the botch up stoneywood were waiting to hear when operations would continue but the frac operator already gave the work away to a competitor and BH didn't even know. They couldn't be bothered to let stoneywood know. Hhahahaha
Same thing, we chose to get run off saving millions
Stoneywood didn't ditch this contract. They were run off you idiot. The frac operator ditched the contract, are yu thick?
Stoneywood saved GE millions by ditching this contract. One of the best decisions by management in Baker history.
These posts should confirm to GE that they need get rid of stoneywood management. They don't want work and don't care about losing contracts. Is there a worse management team in baker than this idiots.
Chuffed
I think it was a good fortune and ultimately beneficial that we lost the contract so early. Saved BH a lot of dollars, saved our fracking managements reputation as fracking market leaders, and we have fewer lessons to be learned and absorbed.
Why did these fracking managers at Stonywood hold a all expenses paid celebratory dinner (wine and drinks included) at an expensive restaurant, after losing the contract ?
This company lost 500 wells coz stoneywood management don't know how to put a project team together. They didn't know what they doing and didn't even get past tophole section on first well before being run off. Didn't even get to fracking first well coz of botch up. What a shambles. Unbelievable management incompetence.
This company lost 500 fracking wells, and you are concerned with weather peoples is used in the right context. About sums up this apology of a company !!
While I will agree that "peoples" is not correctly being used in the post, "peoples" is, in fact, a legitimate word when used in the correct context.
At the end of the day BH Stoneywood are just completely useless frackers, with no fracking expertise. But I'm sure that won't stop them fracking up in the future. Curry anybody ?