Thread regarding Dell Inc. layoffs

Something positive for the EMC guys at Cork

Dell EMC is taking production into its own hands after the termination of contract with their supplier Celestica. The author of the article claims to have insider information that there will be an increase of workforce at the Cork facility. Think this means that the guys at Cork can feel a little safer, from any sort of cuts or reductions

https://www.theregister.co.uk/2018/09/20/dell_inhouses_production_dumps_celestica_in_ireland/

by
| 1996 views | | 2 replies (last ) | Reply
Post ID: @OP+Vh2mOiy

2 replies (most recent on top)

“A Little Safer’,

I don’t think so!

by
| | Reply
Post ID: @iewm+Vh2mOiy

And what about the Jobs that will possibly be lost in Galway City because of that?

I really hope guys in Cork with Degree’s and Masters are ready for the assembly line to come.Good luck

by
| | Reply
Post ID: @7oqt+Vh2mOiy

Post a reply

: