Thread regarding National Oilwell Varco Inc. layoffs

Chemineer to be taken off Manchester

by
| 3381 views | | 25 replies (last ) | Reply
Post ID: @OP+VaMCBrJ

25 replies (most recent on top)

I guess it’s the mancoon way no talent and no brain to learn with.......just saying these clowns struggle with shoe laces

by
| | Reply
Post ID: @1xudw+VaMCBrJ

Nobody gives a cr-p about chemineer

by
| | Reply
Post ID: @kooa+VaMCBrJ

No

by
| | Reply
Post ID: @kblb+VaMCBrJ

Getting back to the original thread is Manchester losing Chemineer then?

by
| | Reply
Post ID: @kkgn+VaMCBrJ

That will never happen, Bilko needs his clueless mates on £50 grand plus, now his son in IT DEPT wonder when his mrs starting as his assistant, the place is going down hill fast because of the man in charge

by
| | Reply
Post ID: @kuny+VaMCBrJ

There will be a massive influx of work with oil prices going towards one hundred dollars a barrel, think about this before you except a two year deal, a two year deal isn’t good you need to look at the big picture 2 1/2% is okay but the sticking point is shift pay they need to increase it by 2 1/2% for the next 3 years.

by
| | Reply
Post ID: @jyud+VaMCBrJ

Free speech on here will not be tolerated anything now said about he who must not be spoken about is taken down God bless America

by
| | Reply
Post ID: @iqqf+VaMCBrJ

Because he wants to bring his family and friends in.. and pay them £50 / £60 grand with no expirence, This guy is determined shut NOV Greengate, we are doomed.

by
| | Reply
Post ID: @gfzz+VaMCBrJ

Why doesn't he promote from the shop floor the talent is there

by
| | Reply
Post ID: @ghay+VaMCBrJ

Comments have been made that Bilko doesn't like and has had removed, but the fact is he's filling the factory with his own people because they won't tell him how it is, these people have no engineering back ground, the place isn't successful because of them it's in spite of them, and there is more money in the pot but he wants to save it for more of the inadequate staff he has already employed, the shop floor needs to grow some backbone and reject his latest offer, the money he saves will spent on staff bonus's, think about it!!

by
| | Reply
Post ID: @fkid+VaMCBrJ

Bilko the bully killing chemineer with the help of cowardly supervisors who know better but won't tell him so get out lads while you can

by
| | Reply
Post ID: @fftq+VaMCBrJ

Careful with names/personal info, apparently that’s not allowed here. Site admins block you and nuke all your posts (at least that’s what they did to me, writing from proxy now).

by
| | Reply
Post ID: @dpnm+VaMCBrJ

If you think the pay offer is good here are the facts

2016 -7.5% pay cut

2017 +2.5% increase

2018 +2.5% increase

2019 +3.5% increase

=1% increase over 4 years

Factor in inflation

2016 +2.1%

2017 +2.1%

2018 +2.4%

2019 +2.0%(estimated)

Given your 1% increase over 4 years once you factor inflation into this in real terms it works out that you will be 7.6% worse off in 2019/2020 than you were in 2015.

Does thay sound like a good deal to you?

by
| | Reply
Post ID: @dgzg+VaMCBrJ

Apparently the worst management in mono pumps history, it’ll be too late before the ants realise they have put a pin brain in charge of Greengate

by
| | Reply
Post ID: @cgdq+VaMCBrJ

+1

by
| | Reply
Post ID: @cxoy+VaMCBrJ

Making chemineer products with 10th rate machinery that'll work

by
| | Reply
Post ID: @bcei+VaMCBrJ

How the hell this place stays open with the quality off staff we employ i will never know,nearest thing to a council run job i,ve ever worked at!

by
| | Reply
Post ID: @byux+VaMCBrJ

Sounds like Gateshead the same there

by
| | Reply
Post ID: @awzs+VaMCBrJ

The word is all those manufacturing chemineer want off and if it doesn't happen will leave

by
| | Reply
Post ID: @apid+VaMCBrJ

Made to order mixers are designed by id--ts who have no knowledge of how things get made....and they are so arrogant they do not care...

by
| | Reply
Post ID: @auzp+VaMCBrJ

I think the writing has been on the wall for some time now with regard to the Chemineer product. The engineered to order product would be manufactured at the Dayton facility; with only the small mixer range being manufactured at Manchester.

by
| | Reply
Post ID: @9kjs+VaMCBrJ

Derby to Montrose to Manchester in 3 years was always going to cause this problem. They treated everyone like sh-- each time they moved it and why would any experienced people want to continue with it.

by
| | Reply
Post ID: @8uth+VaMCBrJ

b---s---

by
| | Reply
Post ID: @7ujn+VaMCBrJ

Good the works sh--e no one wants to do it and its ran by people who havnt got a clue.

Good riddance.

by
| | Reply
Post ID: @1phq+VaMCBrJ

Not surprised

by
| | Reply
Post ID: @ggp+VaMCBrJ

Post a reply

: