Signs on conference room doors in bldg b say “conference room unavailable do not enter.”
There were several layoffs today in design and engineering, all from bldg b.
Part of the restructuring plan is to relocate global propulsion systems to Warren, but there’s been no timetable for that other than “sometime in 2019.”